Sign In | Join Free | My qualitytoyschina.com |
|
Brand Name : BJTUFF
Model Number : 520-3000mm or as required
Certification : ISO9001
Place of Origin : China
MOQ : 1 Piece
Price : Negotiated
Payment Terms : L/C, T/T
Supply Ability : 200 Unit/Units per Month
Delivery Time : 7 days after payment
Packaging Details : Plastic case
Name : Double wall casing tube
Color : As your required
OEM : Available
Material : Q355B
Suitable layer : loosening of the soil structure
Diameter : As your required
880/800mm Bore Hole Bauer Double Wall Casing Tubes
Application:
1. Casing is used to minimize loosening of the soil structure around the pile during the drilling process.The use of casing is compulsory ,if even with a supporting suspension,the ground to be drilled is unstable ,and collaps of the bore hole wall must be expected.
2. Casing tubes must run ahead of the drilling process,to forestall loosening of the soil structure below the bore hole bottom.
Feature
1. The technical parameters and processes of the products are in line with the Bauer standard;
2. Deformation and accuracy is strictly controlled through heat treatment,each casing is interchangeable;
3. BJTUFF casing joints are manufactured from tempered steel.The casing joints with high machining accuracy guarantee a fast replacement and bolting of the casings as well as the best force transmission effect.
Model List:
Casing Dia. | Inner Shell THK. | Outer Shell THK. | Casing THK. | Weight(3 meter) |
680-600 | 8 | 12 | 40 | 1090 |
880-800 | 8 | 12 | 40 | 1335 |
1080-1000 | 10 | 16 | 40 | 2180 |
1280-1200 | 10 | 16 | 40 | 2480 |
1600-1500 | 12 | 20 | 50 | 3910 |
1800-1700 | 12 | 20 | 50 | 4435 |
2000-1880 | 16 | 25 | 60 | 5900 |
2500-2380 | 16 | 25 | 60 | 7310 |
Remark : All measurements are in millimeters, weight in kilograms. |
Tips of casing and tubing for piling project
1. The pipe casing should avoid to the collision, especially of casing joints knock against when install the casing bolts, it must be clean, otherwise it will cause the difficult installation.
2. The drilling bucket needs to be chiseled in advance when pile casing drives the increased torque to difficult.
3. The drilling bucket needs to be checked position and verticality of hole, to avoid opening the door at the hole bottom when lift the drilling open and closed again against to casing shoes.
Product advantage:
1- We purchase top quality raw materials from leading raw-steel factory.
2- Our drilling tools can be customized depending on kinds of rigs and site conditions.
4- Understand what customers need and provide what customers want, We provide one-stop solution for the world’s foundation construction users.
![]() |
Bore Hole Bauer 880/800mm Double Wall Casing Tubes Images |